northbound stop sign
Northbound stop sign installed September 27, 2004

southbound stop sign
Southbound stop sign installed September 27, 2004
(Note: this is a three-way stop)


northbound sign
Northbound proposal sign, picture taken September 21, 2004
This sign was installed September 20, or only 7 days before the stop signs were installed.
The Board enacted policy requires that these signs be up for a minimum of two weeks.